[1]
Putra, A.M. and Mundari, S. 2026. Implementation of Material Requirements Planning to Minimize Stockout and Material Procurement Costs in Volume Damper Production. JRSI (Jurnal Rekayasa Sistem dan Industri). 13, 01 (Jun. 2026), 95–102. DOI:https://doi.org/10.25124/jrsi.v13i01.11065.