PUTRA, Adiksa Madha; MUNDARI, Siti. Implementation of Material Requirements Planning to Minimize Stockout and Material Procurement Costs in Volume Damper Production. JRSI (Jurnal Rekayasa Sistem dan Industri), [S. l.], v. 13, n. 01, p. 95–102, 2026. DOI: 10.25124/jrsi.v13i01.11065. Disponível em: https://journals.telkomuniversity.ac.id/jrsi/article/view/11065. Acesso em: 28 jul. 2026.