Putra, A. M. and Mundari, S. (2026) “Implementation of Material Requirements Planning to Minimize Stockout and Material Procurement Costs in Volume Damper Production”, JRSI (Jurnal Rekayasa Sistem dan Industri), 13(01), pp. 95–102. doi: 10.25124/jrsi.v13i01.11065.